May 16, 2017

Winner – Project of the Year

Project of the Year WINNER

Awarded for the most innovative and technically challenging motion control project, which has achieved demonstrable successes in relation to the original client brief.

SPONSORED BY: abb

Bosch Rexroth - Offshore Wind Farm Piling Template

Bosch Rexroth introduced simultaneous piling of the four piles for each wind turbine on the customer’s template, saving time and introducing unprecedented accuracies beyond the reach of traditional methods. A bespoke precision heavy duty electrohydraulic subsea drive and control system was developed with enhanced capability with superior connectivity and control from the commissioning vessel’s cabin. Significant reductions in time and costs were achieved during the installation and deployment programme with no impact to operational safety.
www.boschrexroth.com

Ready for the MCI Awards 2018?

Interested in attending, sponsoring or entering?

Your Name (required)

Your Email (required)

Subject

Your Message

Interested in attending, sponsoring or entering?